Skip Navigation Links

2014 Regular Session
SR159   by Senator A.G. Crowe      

WATER/WATERWAYS:  Creates the Lower Pearl River Basin Ecosystem Study Commission

Current Status:  Sent to the Secretary of State


Skip Navigation Links
TextExpand Text
DigestsExpand Digests
AuthorsExpand Authors

 Date   ChamberJournal
Page
Action sort history by ascending dates
05/30S56  Enrolled. Signed by the President of the Senate and sent to the Secretary of State by the Secretary of the Senate.
05/27S10  Read by title and adopted.
05/27S10  Rules suspended. Called from the Calendar.
05/27S7  Read by title and returned to the Calendar, subject to call.
05/26S7  Introduced in the Senate. Read by title and placed on the Calendar for a second reading.




If you experience any technical difficulties navigating this website, click here to contact the webmaster.
P.O. Box 94062 (900 North Third Street) Baton Rouge, Louisiana 70804-9062