§2247. Construction of Part
A. Nothing in this Part shall be construed to deprive any claimant, as defined in
this Part and who has complied with the notice and recordation requirements of R.S.
38:2242(B), of his right of action on the bond furnished pursuant to this Part, provided
that the action must be brought against the surety or the contractor or both within one year
from the registry of acceptance of the work or of notice of default of the contractor,
except that before any claimant having a direct contractual relationship with a
subcontractor but no contractual relationship with the contractor shall have a right of
action against the contractor or the surety on the bond furnished by the contractor, the
claimant shall, in addition to the notice and recordation required in R.S. 38:2242(B) give
written notice to the contractor within forty-five days from the recordation of the notice of
acceptance by the owner of the work or notice by the owner of default, stating with
substantial accuracy the amount claimed and the name of the party to whom the material
was furnished or supplied or for whom the labor or service was done or performed. The
notice shall be served by mailing the same by registered or certified mail, postage prepaid,
in an envelope addressed to the contractor at any place that the contractor maintains an
office in the state of Louisiana. Except as provided in Subsection B of this Section,
nothing in this Part shall be construed to preclude a surety who has furnished such a bond
from asserting any defense to the principal obligation that its principal could assert except
lack of capacity or discharge in bankruptcy of the principal obligor.
B. The surety shall be obligated and required to issue payment to a materialman for
claims by a materialman under the following conditions:
(1) The claim is for material delivered in conformity with material specifications
provided in the order for such material.
(2) No sooner than forty-five days after delivery of the material, the materialman
sends a notice of nonpayment to the general contractor, the surety, and the owner.
(3) A materialman has not been paid in full on or before ninety days after delivery
of the material.
C. If the requirements of Subsection B of this Section are satisfied, the surety shall
pay the materialman within ten days after the materialman sends a payment notice to the
surety.
D. The claim of a materialman and right to payment as provided in Subsection B
of this Section is in addition to and not in derogation of any other rights, claims, or
remedies available to a materialman in this Part.
E. Any notice required under this Section shall be served by mailing the same by
registered or certified mail, postage prepaid, in an envelope addressed to the last known
address of the general contractor, the surety, and the owner. The return receipt indicating
that registered mail or certified mail was properly addressed to the last known address of
the general contractor, the surety, and the owner and deposited in the United States mail
regardless of whether the registered or certified mail was actually delivered, refused, or
unclaimed satisfies the notice provision of this Section.
Amended by Acts 1960, No. 117, §1; Acts 1962, No. 16, §1; Acts 1985, No. 244,
§1; Acts 2024, No. 761, §1, eff. June 19, 2024.